New Construction Method Product List and Ranking from 11 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Jul 16, 2025~Aug 12, 2025
This ranking is based on the number of page views on our site.

New Construction Method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Jul 16, 2025~Aug 12, 2025
This ranking is based on the number of page views on our site.

  1. アクス Kanagawa//Building materials, supplies and fixtures manufacturers
  2. ニッコン Tottori//General contractors and subcontractors
  3. null/null
  4. 4 アップコン Kanagawa//others 沈下修正の専門家【全国対応】【本社】神奈川県川崎市【事務所】札幌・仙台・名古屋・大阪・福岡
  5. 5 Tokyo//Building materials, supplies and fixtures manufacturers 東京本社

New Construction Method Product ranking

Last Updated: Aggregation Period:Jul 16, 2025~Aug 12, 2025
This ranking is based on the number of page views on our site.

  1. New method for dam holes! Slab opening slide reinforcement bar box 'Selbon' アクス
  2. [NETIS Registration] A new method for quickly repairing deteriorated gutters due to aging. ニッコン
  3. New method 'PPE method' for chipping work in repair construction.
  4. 4 Emergency restoration method "Dantan": A new technique by the sinking correction expert Upcon. アップコン 沈下修正の専門家【全国対応】【本社】神奈川県川崎市【事務所】札幌・仙台・名古屋・大阪・福岡
  5. 5 New method for slope protection! Honeycomb frame 'SPIKE(R) Spike' 泉 東京本社

New Construction Method Product List

1~12 item / All 12 items

Displayed results

"MS Method" Non-heat metal crack repair! A new method that does not generate thermal distortion.

No secondary cracking thermal distortion occurs! Cast iron crack repair! Metal crack repair!

The "MS Method (Mechanical Stitch)" is a groundbreaking repair technique (Mechanical Stitch Method) that addresses metal cracks using mechanical methods. Since no heat is applied at all, there is no "thermal distortion." Residual stress does not occur in other areas, preventing secondary damage such as new cracks. Metal cracks are one of the concerns in equipment maintenance operations. In conventional welding repair methods, the base material around the crack changes due to heat, leading to residual stress and distortion, which always carries the risk of "crack recurrence" and "secondary damage." 【Features】 ■ No hardening or residual stress due to heat ■ Elimination of secondary damage ■ Maintenance of stable quality  → Integrated system repairs using jigs, etc.  → Accumulation of know-how, experience, and track record ■ Completion of construction in a short period  → No significant decrease in the operating rate of equipment ■ Advantages in safety and environmental aspects  → No use of fire, thus no impact on the operating rate of other equipment or the environment.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[NETIS Registration] A new method for quickly repairing deteriorated gutters due to aging.

Old ditches create issues such as noise, aesthetic problems, and danger. With easy grating, you can utilize the foundation of problem-free ditches and make repairs in a short period!

The long-neglected and damaged drainage ditches not only create a rattling noise every time a vehicle passes but also pose a risk of pedestrians falling and getting injured, as well as detracting from the landscape. The "drainage ditch repair method" proposed by Nikkon involves leaving the undamaged lower part of the ditch intact while only repairing the damaged upper part. We introduce various types of "Easy Grating Type II" that accommodate T25 cross-section, standard mesh, and fine mesh loads, as well as the "CR Slab Type II" that integrates the upper and lower parts with non-shrink mortar, and the "CR Slab for Cross-Section" that collects water through a central grating. 【Features】 ● No need for complex formwork, leading to reduced construction time. ● The material for the receiving frame is high corrosion-resistant galvanized steel plate (ZAM), making it resistant to rust and highly durable. ● The length of the receiving frame is a four-sided frame of L2015, designed to accommodate two L995 main units. ● Height adjustment sections are provided at four points on the four-sided frame, allowing for fine height adjustments after installation using adjustment bolts. ● Adjacent receiving frames can be connected and integrated with bolts. ● The grating body is fixed with bolts. NETIS Registration Number: CG-170001-A *For more details, please refer to the catalog or feel free to contact us.

  • Gutters and U-shaped gutters
  • Paving of sidewalks, roads, parking lots and stadiums
  • Road construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Safer and more efficient asbestos removal. New method using chemicals and high-pressure mist.

Finishing in one go with ultra-high pressure mist. Achieving safe and speedy removal even with a small number of people.

Our company has started a leasing business for the JP method to safely and quickly carry out the demolition of structures containing asbestos. We provide comprehensive support for the cumbersome procedures with local governments, pre-demolition surveys and analyses, worker training, and machinery operation and maintenance. This addresses labor shortages and health issues for workers. 【Our Company’s Highlights】 ■ For Architects We offer total support for procedures with local governments, measures for neighboring areas, and analyses of air quality and filters. ■ For General Contractors and Subcontractors Dedicated staff will manage pre-training for workers, oversee operations, assist with work, and maintain machinery on-site. ■ Key Points of the Method - Uses less water compared to high-pressure washers, reducing waste volume and disposal costs. - Sprays an asbestos dust prevention agent "JP-2000," allowing for removal and compression using suction devices, effectively preventing asbestos dispersion. - While traditional methods require mobilizing 50 workers, the "JP method" can be executed with just two machines. *For more detailed information, please download the PDF. *For inquiries about the new method leasing, please feel free to contact us.

  • Renovation and repair methods
  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

New method for slope protection! Honeycomb frame 'SPIKE(R) Spike'

Prevents gully and erosion phenomena! Flexible, lightweight, and compact! Excellent workability, outstanding corrosion resistance in the soil, and effective for snow accumulation applications at ski resorts!

The "Spike" method was devised in France in 1978 and was subsequently presented at the Second International Conference on Geotextiles (USA) in 1982. This method uses non-woven fabric with excellent drainage and water retention properties, molded into a honeycomb shape through a special manufacturing process, and is employed in vegetation methods for slopes to prevent gully and erosion phenomena, making it an excellent slope protection technique. Additionally, it takes advantage of the features of a frame that has high corrosion resistance in the soil and strong tensile strength, facilitating labor-saving operations. It is used as a reinforcement material for concrete and asphalt, and recently its application range has expanded to include snow retention in ski resorts. 【Features】 - High drainage and water retention effects, preventing the outflow of soil and seeds due to rainwater. - Made from polyester, offering high durability in the soil. - Lightweight and compact, providing excellent workability for storage, transportation, and site delivery. - Easy to install on curved surfaces, adaptable to uneven sites. - Capable of uniformly laying soil, sand, gravel, and other materials. - Load is distributed, accommodating loads from soil, snow, etc. *For more details about the product, please download the PDF materials or contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the related links below ⇩

  • Earthworks

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Emergency restoration method "Dantan": A new technique by the sinking correction expert Upcon.

Quickly restore road unevenness and depressions during an earthquake with polyurethane resin, enabling swift vehicle passage. Contributing to the establishment of emergency transportation routes!

The new method "Emergency Restoration Method Dantan" developed by Upcon involves spraying high-strength polyurethane resin onto road unevenness caused by disasters during earthquakes to create a slope, enabling temporary vehicle passage for the early establishment of emergency transportation routes. A truck equipped with all necessary materials rushes to the site and sprays a two-component polyurethane resin onto the created unevenness. The high-strength polyurethane resin has the property of hardening immediately after spraying, allowing for vehicle passage within 15 minutes after the slope is created. Additionally, it can be used to repair not only unevenness but also depressions and subsidence. Features of the Emergency Restoration Method Dantan: - Ability to create slopes tailored to the shape of the disaster-affected site - Resolution of unevenness in about one hour, allowing immediate vehicle passage Furthermore, it has a proven track record in correcting tilts and unevenness of concrete floors and pavement slabs caused by earthquakes or ground subsidence, as well as filling voids. [Exhibiting at EE Tohoku '23] We will be exhibiting at the comprehensive exhibition of new technologies, EE Tohoku '23. At our booth, we will conduct demonstrations using polyurethane resin. Location: Yume Messe Miyagi Dates: June 7 (Wed) - 8 (Thu) Booth No: West Hall Exhibition B-708

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

New method for landslide and liquefaction countermeasures! 【Legend Pipe Method】

Suppressing landslides and liquefaction! Introducing a construction method that combines drainage pipes and thrust methods.

The "Legend Pipe Method" is a new technique that combines drainage pipes with thrust construction, allowing for the speedy installation of drainage pipes in deep locations. It efficiently lowers groundwater levels and mitigates landslides and liquefaction phenomena. Thanks to the return function of the tunneling machine, it is possible to retrieve the machine by pulling it back to the launch shaft side without needing a receiving shaft. Additionally, the adoption of a slurry method allows for compatibility with high groundwater levels. The tunneling machine is equipped with a gravel crushing bit, enabling it to handle various soil types, including sandy soil, gravelly soil, and soil mixed with coarse stones. 【Features】 ■ Return retrieval type ■ Wide range of applicable soil types ■ Long-distance thrust ■ Landslide countermeasures ■ Liquefaction countermeasures *For more details, please refer to the PDF document or feel free to contact us.

  • Rock drills, demolition machines, and excavators
  • Drainage and ventilation equipment
  • Pipeline Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

New method for dam holes! Slab opening slide reinforcement bar box 'Selbon'

Reduce CO2 emissions by about 20% without welding! As a result, construction time and total costs can also be reduced.

"Selbon" is a groundbreaking product developed to solve the conventional construction process of creating openings (formwork production, reinforcement, curing, and formwork removal) with a single component. The reinforcement bars are modularized, reducing the workload associated with slab openings. It also eliminates the need for welding and can reduce CO2 emissions by approximately 20% compared to traditional methods. It is environmentally friendly and contributes to the SDGs. Additionally, it significantly shortens the construction timeline and reduces total costs, which are major advantages. [Features] - No need for formwork production or reinforcement around openings - Combines a rebar mesh formwork, resulting in zero industrial waste - Certified as a "Low CO2 Kawasaki Brand" product - Obtained performance certification from the Japan Building Disaster Prevention Association (No. 04-11) *For more details, please refer to the catalog. Feel free to contact us with any inquiries.

  • Reinforcement and repair materials
  • Unit and other construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Heat-insulating steel plate wrap method: A new technique aimed at an era exceeding 40°C.

In the era of extreme temperatures, a major shift in heat insulation is taking place, with a completely new method that cools roofs and exterior walls at 85°C using air at 40°C, allowing for roof renovation and heat insulation simultaneously, with a durability of 30 years.

The heat-insulating steel plate lap method involves applying heat-insulating material to steel plates to cover existing slate roofs, corrugated roofs, walls, etc., while also utilizing ventilation. This is the latest next-generation heat-insulating method. It has already been patented and is an original method of Japan Heat Insulation that cannot be imitated by other companies. It allows for roof renovation, provides heat insulation, boasts the same durability as roofing materials (30 years), and achieves maintenance-free performance.

  • Roof and gutter construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Revolutionary new method for removing car stops in ports and fishing ports: "Slash Cut Method."

NETIS registration method! Slash cut method that achieves the fastest removal.

Currently, numerous maintenance and repair activities are being carried out at ports and fishing ports nationwide as part of aging infrastructure measures, leading to an increase in the repair of vehicle stops. Consequently, there are more opportunities to remove the covered steel plate vehicle stops that have been installed in various locations across the country, and the reality is that significant labor and time are required for this removal on-site. In order to address such issues, Mirai Kōro Co., Ltd. has developed a new method called the "Slash Cut Method" using a wall saw, achieving labor savings and a reduction in construction time. The "Slash Cut Method" is a new technique for removing vehicle stops by cutting the anchor bolts of the upper structure at an angle with a wall saw. We are confident that this method will be of great benefit in future projects. 【Features】 ○ NETIS registered method, Registration Number QSK-150002 ○ Speeding up removal → No heavy machinery or chiseling required; quick removal with a wall saw ○ Reduction in workforce → No special tasks needed; removal can be done with a small team For more details, please contact us or download the catalog.

  • Work tools

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Fireproof Putty Plaseal NF-12HM New Method

【New Construction Method Acquisition】 The certification range for the fireproofing method for cable penetration, Plaseal NF-12HM, has been expanded, making it more user-friendly and convenient.

【Acquisition Method】  ■PS060WL-1158    ALC wall, concrete wall (with or without PVC pipe sleeve)  ■PS060WL-1159    Compatible with 6 steel boxes (outlet and switch boxes)  ■PS060FL -1160    Concrete floor (with or without PVC pipe sleeve)  ■PS060WL-1161    Compatible with hollow walls (round holes, square holes), etc. 【Product Features】  ■Non-drying (non-curing type) for easy re-wiring work  ■Easy-to-use with slits  ■High workability as it does not harden easily even at low temperatures * For more details, please download the catalog or feel free to contact us.   Contact number (phone) 06-6693-3561

  • Subsidiary materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

New sports direct floor construction method "Texcel Floor Method (Resin Honeycomb Floor)"

Direct floor construction method, uniform floor performance, optimal for renovations, quiet, reduced construction work, customization, reduced burden on feet.

Revolutionary Direct Floor New Construction Method Newly developed structure based on resin honeycomb panels "Texcel" By eliminating the need for an underfloor space, the number of components and construction time can be significantly reduced, achieving simplified construction and shorter construction periods. With adjustments to the functionality of "Texcel," the elastic layer, and the choice of floor finishing materials, it is possible to customize hardness and shock absorption. **Features** ■ Overwhelming reduction in construction work with ultra-lightweight honeycomb panels ■ Uniform rebound force with no variation depending on where it is stepped on ■ Customizable elasticity to suit various applications, reducing strain on the feet ■ Maintains elasticity even with additional flooring, making it an ideal recovery material for flooring renovations ■ High load capacity, capable of supporting 10-ton vehicles (flooring type) ■ Made from recycled materials, environmentally friendly product ■ Excellent thermal insulation, alleviating cold floors ■ Reduction of indoor noise **Texcel Floor Overlay Construction Method** A new method for renovating and maintaining gymnasium floors **Features** ■ The honeycomb panel and elastic layer allow for the recreation of the athletic performance and safety of new construction ■ Thin layer thickness allows for easy elimination of height differences ■ Inspection and ventilation openings can be utilized as is *For more details, please refer to the related links or feel free to contact us.*

  • Other flooring materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration